Garmann Miller designed a new elementary facility for New Bremen students in grades K-6 in 2020. The new 71,000 square-foot building is connected to the existing high school. The connector on the southeast side of the high school is known as the Dianne Komminsk Center for Innovative Thinking and was paid for entirely by a generous donation from the late Dianne Komminsk, a New Bremen resident.